Environmental Management Plan
Envirotech’s team is experienced to formulate comprehensive master plans from the findings of the Environmental Impact Assessment and present this in an easily applicable manner to the ultimate users.
The implementation of Best Practices is recommended in the Environmental Management Plan such that the significant impacts are either reversed or minimized to maximum possible levels. The Company assigns experts to ensure proper execution of the recommendations, which are structured to get gelled-in with the project design and remains valid and updated throughout the life-cycle of the Project.
We prepared construction and operational environmental management plans for a range of Projects which includes:
- Spent Pot Lining (SPL) Processing Plant – Aluminium Bahrain BSC
- Direct Chill (DC) Slab Casting Green Field Project – Gulf Aluminium Rolling Mill Co. BSC
- Sewage Treatment Plant at King Abdullah Bin Abdul Aziz Medical City
- Hazardous Waste Incinerator – Crown Incineration Services
Would you like more information about?
Write to us!